Event Summary
 
  FILE SAVED AS: VACS_23441_20180126_0655.htm  
 
 Incident:   VACS_23441_20180126_0655   Date:  01/26/2018 (CST)   Reliability Coordinator:  VACS 
 Initial Conditions:   N/A
 Flowgate:   23441 - Parkwood AT-5 500/230kV flo Pa...   Rating:  0   LODF:  72.63%
 TLR Direction:   Normal 
 Effective StartTime:   01/26/2018 06:55 (CST)   Effective EndTime:  01/26/2018 07:50 (CST)   TLR Duration:  55 Minutes
 
TLR Actions
 Confirm 
 Time 
 Level   Effective 
 Hour 
 Priority   Schedule   NNL Relief   Market Relief   Flow   Cont. 
 Flow 
 TLR Action Comments 
 Total Tags 
 Cut / Hold 
 IDC Cut   RC Cut 
 Acknowledge 
 Hold   CA   IDC 
 MW 
 RC 
 Ackn 
 MW 
 Type   Mkt   IDC 
 MW 
 RC 
 Ackn 
 MW 
 Current   Post 
 Cont. 
 MW   Relief   MW   Relief   MW   Relief 
Jan 26 
07:00 (CST) 
 TLR 3B   CURRENT 
 2-NH 
 3-ND 
 6-NN 
 Total 
 1 / 0 
 1 / 0 
 1 / 0 
 3  /  0 
 7 
 150 
 75 
 464 
 0.4 
 14.0 
 6.1 
 20.6 
 7 
 150 
 75 
 232 
 0.4 
 14.0 
 6.1 
 20.6 
 0 
 0 
 0 
 0 
 0.0 
 0.0 
 0.0 
 0.0 
 NONE   NONE   0   0   0 N/A
 NEXT 
 2-NH 
 3-ND 
 6-NN 
 Total 
 1 / 0 
 1 / 0 
 1 / 0 
 3  /  0 
 7 
 871 
 75 
 464 
 0.4 
 81.4 
 6.1 
 88.0 
 7 
 871 
 75 
 953 
 0.4 
 81.4 
 6.1 
 88.0 
 0 
 0 
 0 
 0 
 0.0 
 0.0 
 0.0 
 0.0 
 NONE   NONE 
Jan 26 
07:28 (CST) 
 TLR 0   CURRENT   NONE   NONE   NONE   0   0   0 N/A
 
TLR Schedule Totals
 Priority   Schedule 
 Total Tags 
 Cut / Hold 
 IDC Cut 
 MW 
 RC Cut 
 Acknowledge 
 MW 
 Hold 
 MW 
 0   0   0   0   0 
 1   0   0   0   0 
 2   2   14   14   0 
 3   2   1021   1021   0 
 4   0   0   0   0 
 5   0   0   0   0 
 6   2   150   150   0 
 7   0   0   0   0 
 Total   6   1185   1185   0